the BEST premium gps tracker & padlock for motorcycle

GET DETAIL PACKAGE (BI)LIHAT PAKEJ LENGKAP (BM)

Theft case involving Stopanik User's motorcycle had solved since 2017

%

45% of Stopanik's Users had a bad experience with a motorcycles theft case.

Stopanik Tribe has joined the Stopanik Community User Program

Why you shall protect your motorcycle at all times?

This worst consequences will make you suffers
gps tracker for motorcycle,gps motor,motorcycle gps tracker,gps tracker malaysia,gps tracker

Waiting for insurance approval 4 - 6 months

gps tracker for motorcycle,gps motor,motorcycle gps tracker,gps tracker malaysia,gps tracker

Had no other vehicle to work or to send your wife or children

gps tracker for motorcycle,gps motor,motorcycle gps tracker,gps tracker malaysia,gps tracker

Spend more money on transport if you don't have another vehicle

gps tracker for motorcycle,gps motor,motorcycle gps tracker,gps tracker malaysia,gps tracker

You could be a victim of trauma all the times

NO MORE PANIC!

All info you needs only at fingertips

Real-time location updates and live movement as fast as 5 second intervals on the map

gps tracker for motorcycle,gps motor,motorcycle gps tracker,gps tracker malaysia,gps tracker
gps tracker for motorcycle,gps motor,motorcycle gps tracker,gps tracker malaysia,gps tracker

Show tracks and events on the map for any period in the past

Get call notification instantly to your smartphone if your motorcycle is being moved or stolen

gps tracker for motorcycle,gps motor,motorcycle gps tracker,gps tracker malaysia,gps tracker
gps tracker for motorcycle,gps motor,motorcycle gps tracker,gps tracker malaysia,gps tracker

Get a reminder when your service is scheduled on time

Fast recovery with Stopanik Community User Program

gps tracker for motorcycle,gps motor,motorcycle gps tracker,gps tracker malaysia,gps tracker
padlock motor

Extra Protection With Premium High Quality Padlock

It just needs 3 simple steps to secure your loved bike

2

Make payment online to book appointment

3

Install device & app

  • Tracked by: SMS, APP, Web Reports location in real time through different interfaces
  • Built-in 150mAh battery High capacity Li-ion battery ensuring sufficient power supply
  • ACC detection for ignition status. Be aware of the ignition status whenever you need
  • Configurable tracking modes. Location uploaded following fixed distance, time interval, preset cornering
  • Multiple alarms Instant alert for vibration, over speed, power off, geo-fence
  • Easy Installation – Very easy to install and hide in the vehicle
  • Real-Time Tracking – 24/7 view exact location, travel speed, fuel consumption and other information
  • Light and compact – Small size allowing covert & easy mounting
  • Intelligent power management – Reduce inefficient power consumption when device stay idle.
  • Motorcycle battery protection – Never drain out of the battery of motorcycle for optimal protection
  • Notifications – Speeding alarm, Geo-fence alarm, vibration alarm, etc
  • Anti-Theft – Protect your vehicle from being stolen with various alarms. Cut engine remotely when vehicle was stolen
  • History and reports – Detailed reports: riding hours, stopovers, distance travelled, fuel
  • Mobile – Access all features on your mobile or tablet

gps tracker for motorcycle,gps motor,motorcycle gps tracker,gps tracker malaysia,gps tracker 

Saka SP05 product brochure 

PACKAGE CONTAINS:

1) Device:

  • SP05 GPS tracker
  • Extension cable
  • 3M Double tape
  • Saka Lock Long Shackle 60mm (add on order – optional)

2) Subscription:

  • FREE 6 months mobile app and software GPS Tracking system subscription
  • FREE 1 unit SIM card with 6 months mobile data

3) FREE configuration & installation setting into your motorcycle

4) 12 months warranty

5) FREE 6 months after sales support

 

 

 

 

Frequently Asked Questions

What type of motorcycle can install SAKA SP05?

SAKA SP05 can be installed on all types of motorcycle 

What is an advantage if I using Saka Lock together with Saka SP05?

First, it is double security protection if you are using Saka Lock and Saka SP05. Second, Saka Lock increases your vibration sensitivity of Saka SP05 whenever there is any cutting, grinding, knocking attempt by the thief. Third, automatically it may slow down the thief’s progress.

For detail about Saka Lock click here

How long it takes for installation?

It takes about 1 hour 30 minutes

Where can I install Saka SP05?

Stopanik authourized installer ONLY AVAILABLE at:

1) Selangor & KL – Seri Kembangan

2) Melaka – Batu Berendam

3) Johor – Johor Bahru

4) Penang

5) Kelantan – Kota Bharu

Please make an online payment, and we will book your appointment within 3-5 days upon free slot, if any.

Does it cut original cable during wiring installation and void warranty?

No. There is no cutting any wire at all. That’s means is not void your motorcycle warranty.

Can i track my motorcycle if parking at basement or elevated parking area.

You only will get the last location updated before entering any building as gps/ gprs signal might be blocked by building structure/ concrete/ steel etc. 

Do i must further subscribe to use Web & App Stopanik GPS Tracking system?

Yes. You shall subscribe the subsequent 6 months or 12 months. Yau can pay online click here

What Happens When My Saka SP05 Subscription Expires?

For detail explanation, you may click here

Does it take a huge motorcycle battery comsumption?

No. SAKA SP05 will optimize your motorcycle battery consumption with activation of special command Intelligent Power Management (IPM) & Idling. 

Do i need to buy my own sim card & data?

Stopanik provides a sim card together with data in a package.

Can i track live my motorcycle even im not in Malaysia?

Yes, you are able to track live as long as your subscription is still active.

What happen if my motorcycle touched by someone?

Saka SP05 will call you to alert you instantly.

What should i do if my motorcycle suddenly been theft?

Issue a ticket to Stopanik Support Team via https://support.stopanik.com

You may sharing deploy your motorcycle live location to activate the recovery process via Stopanik Community User Program. Click here for more detail.

 

How I should get extra protection for my motorcycle?

Use Saka Lock to add more extra sensitity on vibration sensor. The more Saka Lock vibrate the more it will contribute vibration to your motorcycle.

Get detail about Saka Lock click here 

 

How can I contact Stopanik Support Team if I facing technical issues or any other inquiries?

Issue a ticket with just login to your account via this link https://support.stopanik.com

Access account and password usually will be provided after purchase.

 

How can I get detail about tutorial how to use?

Issue a ticket with just login to your account via this link https://support.stopanik.com

Access account and password usually will be provided after purchase.

For tutorial videos, you may view them all on our youtube channel. Click here

 

RIDERS CHOOSE SAKA SP05

 Be like them. Not only for your own self but care others too #kitajagakita

View more review and follow us closely

As seen on 

malaymail
harianmetro
pandulaju

Don't wait until you be the next victim

Stopanik is the smartest choice
lihat pakej lengkap (BM)get detail package (BI)